Precision Cost lets you define how Toolio builds a choice's Unit Receipt Cost — list cost, supplier discount, freight and duty, and anything else your business uses — instead of relying on a single cost value. The Cost Detail tab on the choice then shows every input behind that cost, week by week and cluster by cluster, tells you where each value came from, and lets you override the one that is wrong.
❗ Precision Cost is enabled per tenant by Toolio, and it stays switched off until an admin saves a cost formula. Until a formula is saved, cost is calculated exactly as it is today, and the Cost Detail tab says no formula is saved.
Use Cases
You need to answer "why does this choice cost \$9.80?" without raising a support ticket.
Your cost is a calculation, not a number your systems send: list cost less a supplier discount, plus freight and duty.
Your vendor sends scheduled cost changes that should land in the right week, not flatten the whole season.
A buyer negotiated a one-off cost for a single week, channel, or cluster.
A choice has no cost at all, and the plan should show that as missing rather than as \$0.
You need the individual cost components on your purchase order export, not just the final unit cost.
How Precision Cost Builds a Cost
Cost resolves per component, per cluster, per week. Each line of your formula is resolved on its own, so a single week can mix sources: list cost from the cost feed, freight and duty from the choice attribute. A component can come from the choice in one week and the feed in the next.
A formula can read four sources, because only these supply a value at or above cluster level.
Source | Prefix | What it contributes |
|---|---|---|
Choice |
| Choice attributes, flat for the life of the choice. |
Cost feed |
| Imported costs, keyed by SKU, channel, and cost type, effective-dated so they change by week. |
Vendor |
| Vendor attributes such as Supplier Discount. |
Choice offering |
| Offering attributes such as Unit Cost and Unit Ticket. |
On any of those models you can read currency, number and percent attributes. Calculated columns cannot be used.
The Formula
Each named line of the formula is one row of the Cost Detail grid, in the order you wrote it. The example below takes a feed price, applies a vendor discount, and adds freight. The editor opens pre-filled with a starter formula, which you can replace with your own.
listCost = pricing.listCost ?? choice.listCost supplierDiscount = vendor.supplierDiscount freightAndDuty = choice.freightAndDuty negotiatedCost = pricing.negotiatedCostSetup ?? listCost * (1 - supplierDiscount) deliveredCost = negotiatedCost + freightAndDuty unitReceiptCost = deliveredCost ?? choiceOffering.unitCost
?? means "use the value on the left; if it is empty, use the next one." It falls through on a blank value only — a cost of 0 is a real cost of zero and stops the chain there.
💡 Blank and zero mean different things everywhere in Precision Cost, from the import file through to the grid. A feed that sends 0 where it means "nothing" will stop every fallback below that line.
Setting Up the Formula
The formula lives at Settings > Configuration > Module Settings > Assortment Plan > Precision Cost, which Tenant Admins and Toolio staff can open while the feature is on for your tenant. The page holds a Precision Cost card with the last saved time, then Cost attributes, Cost type attribute, Unit Receipt Cost formula with its Available references list, and Dry run.
Writing and Testing a Formula
Add every attribute your formula reads under
Cost attributes. The table gives each one's model, type, and formula reference, and tags itUsedorNot usedagainst the current formula text.Write one assignment per line, as
name = expression, referencing attributes assource.attribute.Supported operators are
+,-,*,/, parentheses, and??. There are no functions and no conditionals.The formula must assign
unitReceiptCost— that line is what the plan, receipts, and purchase orders read. End it with?? choiceOffering.unitCostto let a choice with no resolvable components keep the offering's existing cost.Percent values are fractions in the formula:
0.15is 15%. In the Cost Detail tab you type a percent override as the percentage itself, so 15 means 15%.Toolio sets which Choice attribute holds the cost type. The
Cost type attributecard shows it and its values, and a choice then sees only the feed rows whose cost type matches its own. A feed row with a blank cost type applies to every choice.Pick a choice above the formula and click
Dry Runto see any problems line by line.Saveruns the dry run first and stops if it finds problems.
What Happens When You Save
Saving switches Precision Cost on and queues a recalculation of every choice, so plan costs catch up over the following minutes rather than instantly. On the largest catalogs it can take from a few minutes to about an hour.
A line's name is both its override key and its export column name. Renaming a line therefore drops that line's overrides and renames its column, so an export mapping on the old name comes back empty; removing a line retires its overrides as well. When a save would drop overridden components, the confirmation dialog turns red and names them, listing the overrides on the choice you dry-ran.
Reading the Cost Detail Tab
Open a choice in Assortment Plan and select the Cost Detail tab, which comes after Markdown Plan. Components run down the side, retail weeks across the top, grouped Total, then channel, then cluster.
The current week's header is highlighted and past weeks are greyed.
Weeks outside a cluster's own plan window show
N/A, which is different from a week with no value.Each formula line is one row, whatever it reads. Select a cell to see which source supplied its value.
A cluster with no channel set appears on its own, and matches only feed rows that apply to every channel.
Cost is always calculated per cluster first and rolled up for display, never averaged first.
Mixed Values and Cell Details
A rolled-up row shows a value only when every cluster beneath it agrees. Where they differ it shows Mixed with the range behind it; expand the row to see each cluster's real value.
The cost feed is per size, so a cluster's own cost is the average of its sizes. Where those sizes cost differently, the cell is flagged Sizes differ and shows the range.
Select any cell and the bar below the grid gives its value, its source, the reason if nothing applied, and who overrode it and when. The common reasons are:
Reason | What it means |
|---|---|
No cost feed row for this choice | The choice has no feed rows, so the formula used its choice-side value. |
Before the first cost feed row | The feed covers this SKU, but starts later than this week. |
Filtered by channel | A channel-specific row exists, but not for this cluster's channel. |
Filtered by cost type | Feed rows exist, but none matches this choice's cost type. |
Overriding a Cost Component
Type a value into any input line in a current or future week. The calculated lines update immediately, an orange corner marks the cell, and hovering shows Overridden by <user> on <date>.
Overriding needs Assortment Plan edit rights, so a channel planner can edit approved choices within their own scope. The same applies to Sync Cost.
An override applies to the week and the scope it was made in, and nothing else. It does not copy forward to later weeks, and it is never written back to the choice attribute or the cost feed. It changes the cost index only: the plan keeps its old dollars and shows Cost out of date until someone runs Sync Cost.
What you edit | What it affects |
|---|---|
A cell on one cluster | That cluster, that week only. |
The same component at Channel level | Every cluster in that channel, that week only. |
The same component at Total level | Every cluster of the choice, that week only. |
Edits copy down, they are never spread: setting a value at Total means every cluster beneath is that value in that week.
To remove one, select the cell and press Delete, or right-click and choose Remove Override. On a Total or Channel row a confirmation names the component, the week, and how many clusters will be cleared.
Three things cannot be edited: calculated lines such as Negotiated Cost and Unit Receipt Cost (Calculated, edit an input instead), past weeks, and clusters priced in another currency under multi-currency planning, which keep their existing pricing cost.
Applying Cost to the Plan With Sync Cost
Toolio recalculates a choice's cost as soon as something behind it moves — a formula attribute, a vendor value, a cluster's channel, the offering's dates, an actual choice link, or a new cost feed file — but it does not rewrite your plan dollars until you ask. Where the new cost differs from what the plan was valued at, the choice's Unit Cost cell in the Assortment Plan grid shows a Cost out of date corner, and the Cost Detail tab shows the banner Cost out of date. Plan metrics don't use these costs yet. Sync Cost applies them.
Most of those changes recalculate within minutes. Some are only picked up overnight: actual choice links made by the PLM import or the propagator, some offering edits, and vendor deletes.
Run it from that banner, or from the plan grid by right-clicking a choice and choosing Functions then Sync Cost. A toast confirms Cost synced. Plan totals update when the metric aggregation finishes. and the warning clears.
Sync Cost changes | Sync Cost does not change |
|---|---|
Receipt \$, On Order \$, sales cost, returns cost, transfer cost, and BOP cost, from the current week forward | Units, in any scenario |
Gross margin, which is derived from those | Ticket and retail |
Both the plan and the system scenario | Past weeks, and size-level rows |
Because receipts are units × cost, a sync does move Receipt \$ and margin — "units don't change" and "nothing changes" are different promises. It runs in the Master scenario only. If Toolio has scheduled the nightly pass for your tenant, it picks up anything nobody syncs by hand.
Cost in Receipts, Purchase Orders and Exports
Once a formula is saved, forecast, receipts, inventory projection, and purchase orders all take cost from Precision Cost rather than from the pricing table. They still read ticket and retail from pricing, which is why repricing cost never moves units.
Receipts landing before launch take the first week's cost, and projection weeks past the end date take the last week's.
A purchase order line takes the cost of the week of its adjusted receipt date — not the first week of the period, not a weighted average — and the plain average of its offerings' costs where it covers several clusters.
That cost is snapshotted onto the line when the purchase order is created or refreshed. Split child lines keep their parent's. On the
Select POstep you can still edit Unit Cost directly; clearing it is rejected.A line's cost and margin cells are empty rather than \$0 when every one of its offerings is blank that week, and so are the totals above them. If none of its offerings has a Precision Cost yet, the line keeps the cost it had before.
Each formula line is available to the line-level export as
recommended_purchase_order_line_item_cost__<line>, sodeliveredCostbecomesrecommended_purchase_order_line_item_cost__delivered_cost. Add the ones you need to your line-level exporter's mapping underSettings > Exports > Exporters. They are not grid columns, and purchase orders created before the formula was saved export them empty until they are refreshed.
The Cost Feed
The cost feed is the time-phased half of Precision Cost: a file of costs by SKU, channel, cost type, and effective date, which the formula reads as pricing.*.
Column | Meaning |
|---|---|
SKU | The size-level SKU. Required. |
Channel Id | The channel the cost applies to. Blank means every channel. |
Cost Type | The cost type this row applies to, in your own codes. Blank means every cost type. |
Effective Date | The date the cost starts applying. Required. |
List Cost | The list cost input. |
Negotiated Cost Setup | The negotiated cost input. |
Status |
|
Amounts are per unit, in your organization's currency, with no symbols or separators. A blank amount means "no value sent"; a 0 means the cost is genuinely zero.
A row applies from the first retail week that starts on or after its effective date and holds until the next row for the same SKU, channel, and cost type. A row dated mid-week does not backdate into the week already under way; it takes effect the following retail week. Where two rows could apply, specificity beats recency: a channel-specific row from week 40 still beats a newer all-channel row in week 44.
An Inactive row withdraws the cost stored for its key, and the SKU falls back to the row effective before it, or to the choice's own attributes. Affected choices re-cost automatically. A file with no Status column counts as all Active, and a blank or unrecognised status rejects that line. Rows whose codes, dates, or amounts cannot be read are rejected individually and reported in the import summary, and the rest of the file still imports.
FAQs
Why does a cost cell show empty instead of \$0?
The choice has no resolvable cost, and an empty cell says so. Empty cost dollars mean "no cost", while \$0 now means the cost really is zero.
Why did Receipt \$ change after Sync Cost when my units did not?
Receipt \$ is units × cost, so re-valuing the cost moves the dollars. Gross margin follows for the same reason.
Why do my size-level rows still show the old cost?
Size-level rows don't use Precision Cost in this version. Sync Cost doesn't re-value them, and receipts and inventory generation keep pricing them from the existing pricing cost, so the old cost stays.
Why does the Total row say Mixed?
The clusters beneath it have genuinely different costs that week, usually because the feed prices their channels differently. Expand the row to see each value.
Does an override update the choice attribute or my exports?
It never updates the choice attribute or the cost feed, because a choice attribute covers the choice's whole lifespan. It does change the cost the plan uses once you run Sync Cost, and the cost of any purchase order created or refreshed after that, including its export columns.
Does a forecast or a receipts generation clear the out-of-date flag?
No. A forecast re-values sales cost and a receipts generation re-values Receipt \$, so neither covers every cost measure. Only Sync Cost, by hand or overnight, clears the marker.
What happens if no formula is saved?
Cost is calculated as it was before Precision Cost. The Cost Detail tab is there but says no formula is saved, and the starter formula in the editor is a suggestion rather than an active default.
